(1)
Harrison, S.; Leuangthong, O.; Crawford, B. Uncertainty-Based Grade Modelling of Kimberlite: A Case Study of the Jay Kimberlite Pipe, Ekati Diamond Mine, Canada. IKC abstracts 2008, 9.